Wales High School, South Yorkshire
A ground source heat pump system for a secondary school, designed and built for BAM.

The brief
Wales High School is being completely rebuilt under the Department for Education's School Rebuilding Programme, for more than 1,800 pupils, with the new building designed to net zero operational standards. BAM, the main contractor, needed a ground source system that would fit a busy school site with as little disruption as possible.
What we did
We designed a 500kW ground source heat pump system. Instead of spreading boreholes across the grounds, we drilled 28 closed loop boreholes radially to 203 metres from just two 3m by 6m platforms, which cuts the civil works dramatically.
The heat pumps, buffers and associated plant are built off site into a prefabricated plant room, taking around six weeks off the work needed on site.
The result
When the new school opens, its heating will come from the ground. BAM gets there with a much smaller drilling footprint and around six weeks less plant room work on site. It is one of several schools we are delivering with BAM under the CF21 construction framework.