Alperton Yard, London
A prestigious development of 461 new apartments with heating and hot water from our heat network.
.jpg)
The brief
Alperton Yard turns a former bus depot in Wembley into 461 homes across three buildings, alongside retail, community space and 2,550 square metres of industrial space. Telford Homes needed low carbon heating that would work on a tight urban site with mixed uses, instead of gas boilers.
What we did
We designed and built a centralised Geo Hub around the site's ground conditions and space constraints. 60 vertical boreholes, drilled more than 240 metres beneath the buildings, supply ground source energy to a central plant room.
Our Design and Build team delivered the complete system, from boreholes to plant room and heat network.
The result
Alperton Yard completed in 2026. The system supplies 100% of heating and hot water, with one coordinated network serving the build to rent, affordable and commercial spaces, and no gas boilers anywhere on site.