Gilston Park, Polmont
A high-end development by Cala Homes and Taylor Wimpey of more than 600 new homes, with all heating and hot water from our ground source heat network.

The brief
Cala Homes and Taylor Wimpey are building more than 600 new homes at Gilston Park, including 25% affordable housing. They needed one low carbon heating system for every home, delivered around a phased housebuilding programme.
What we did
We designed a ground source heat network as development-wide infrastructure: 329 vertical boreholes, each 167 metres deep, coordinated around roads, utilities, drainage and the build phases.
One team coordinates the design, drilling, network and commissioning as the development grows.
The result
Heat pumps provide 100% of space heating and hot water, so private and affordable homes have the same low carbon system, and compliance becomes a site-wide plan that can actually be delivered.